We find energy nobody else can use (geothermal heat, stranded gas, power with no grid to sell into) and turn it into Bitcoin. Our engineers build the site, our tech team runs it, and the books stay open. Host with us, or own a share of the site.
* Modeled all-in cost to produce one bitcoin on our 5 MW pipeline-gas deployment: 1,350 Antminer S21 XP units, gas at $1.60/MCF. This is our modeled cost, not a forecast of anyone else's results; actual cost moves with network difficulty, gas price and uptime. The expiry date is the 2028 halving, when cost to produce roughly doubles.

Deep in the Utah desert, a geothermal plant pulls clean, round-the-clock power straight out of the earth, with no grid to sell it into. That is stranded energy: real megawatts with nowhere to go. We went and got it.
Our engineers designed the entire tie-in from scratch: the transformer, the switchgear and breaker coordination, and a 2 MW air-cooled mining container sized to what the plant actually produces. Our tech team built out the fleet behind it, with current-generation ASICs, remote monitoring and our own Bitcoin node. One crew, start to finish, from the wellhead to the hash.
Choose from vetted sites with power in place or close to it. Every listing shows capacity, region and time to power.
We deploy and run your machines on the site. Operating costs are billed open-book: documented cost plus a fixed 10%.
Qualified investors can move from hosting to owning a portion of the site itself, at a value set before you buy in.
Our deployments run on contracted pipeline gas and firm power, so the cost to produce is something we can model and publish.
You see the operating invoices. We add a flat 10% for running the site. No hidden markup on power.
You talk to the people who find, build and run the site. No chain of brokers between you and the hardware.
Already hosting machines somewhere? Tell us what you run today and what you want to own. We will come back with the sites that fit.