Go Back

Site A5

2_2 MW site 4 containers
2_2 MW site 4 containers
2_2 MW site 4 containers
2_2 MW site 4 containers

Description

Turnkey Price : $3,871,000

Location South Texas
Container Type Hydro – Foghashing S1200
Generator Type Used CAT G3516
Capacity 166 PH/s
Effective Power Cost 4.06¢/kWh
Cost to Mine 1 BTC $29,775

Site A5 HYD represents one of Blue Hawk’s flagship mining installations: a 2.2-megawatt hydro-cooled Bitcoin mining operation in South Texas, engineered for maximum throughput and long-term hardware integrity. The site leverages stranded natural gas — surplus gas produced in association with oil extraction that lacks pipeline infrastructure — and converts it into continuous electrical power via a Used CAT G3516 generator, a proven platform for sustained industrial generation in field environments.

At the core of the operation are 420 units of the Bitmain S21+ Hydro, housed in a Foghashing S1200 hydro-cooled container — the industry benchmark for immersion-cooling performance. This configuration delivers 166 petahash per second of total hashrate at an efficiency of 15 joules per terahash and a total power draw of approximately 2,010 kW. Hydro cooling eliminates the thermal limitations of air-cooled systems, enabling the ASICs to run at sustained peak efficiency regardless of ambient temperature — a decisive operational advantage in South Texas.

Site A5 HYD achieves an effective power cost of 4.06 cents per kilowatt-hour and a Bitcoin production cost of $29,775 per coin — placing it among the most cost-competitive sites in the entire portfolio. With monthly Bitcoin output of approximately 2.21 BTC, the site delivers institutional-scale production economics backed by proven CAT generation reliability and the long-term hardware longevity benefits of hydro-cooled operations.

Gas Details

MCF PER DAY
733
MCF
GAS BTU
1030
BTU
Volume Consistency
725-780
Gas Composition
H2S Content Known (Hydrogen Sulfide levels documented), High BTU Content (1,000+ BTU, premium quality), Minimal Inerts (Low N2/CO2, good energy density), Wet Gas (Contains ethane, propane, butane - higher value), Dry Gas (Primarily methane, standard quality)

Learn How To Buy This Site

INTERESTED?
Would you like to learn more about this site? Schedule A Call Here https://bit.ly/BlueHawk15

Media

2_2 MW site 4 containers
2_2 MW site 4 containers
2_2 MW site 4 containers
2_2 MW site 4 containers

Location

Surface Rights
Surface Rights For Mining Secured, Surface Rights For Mining To Be Negoitiated, Surface Rights For Mining Unkown