Go Back

Site X5

big site X5
big site X5
big site X5
big site X5

Description

Turnkey Mining Price $8,455,000

Location South Texas
Container Type Hydro – Upstream Gen Hash 300
Generator Type Used CAT G3516
Capacity 231 PH/s
Effective Power Cost 3.83¢/kWh
Cost to Mine 1 BTC $19,635

Site X5 is Blue Hawk’s highest-performance Bitcoin mining operation — a 2.2-megawatt installation in South Texas powered by stranded natural gas and built around the most energy-efficient Bitcoin ASIC currently available: the Bitmain S23+ Hydro 3U. Operating at an industry-leading 9.6 joules per terahash, this next-generation miner delivers dramatically more hashrate per watt than any current-generation air-cooled alternative, positioning Site X5 at the absolute frontier of Bitcoin mining economics.

The site deploys 199 units of the S23+ Hydro 3U inside an Upstream Gen Hash 300 container — a hydro-cooled enclosure built for the thermal demands of the highest-output ASIC hardware on the market. Together, these 199 units generate 231 petahash per second of total hashrate, the highest single-site capacity in the Blue Hawk portfolio, at a total power draw of approximately 2,193 kW. Power is supplied by a Used CAT G3516 generator running on stranded natural gas from a dedicated single-well gas source.

The economics of Site X5 are exceptional. At an effective power cost of 3.83 cents per kilowatt-hour — the lowest in the portfolio — and a Bitcoin production cost of just $19,635 per coin, Site X5 operates at a margin that most competing mining operations cannot approach. Generating approximately 3.08 BTC per month, this site represents the premium tier of Blue Hawk’s gas monetization strategy: next-generation hardware, best-in-class cooling, and the deepest cost advantage in the network.

Gas Details

MCF PER DAY
733
MCF
GAS BTU
1030
BTU
Volume Consistency
730-780
Gas Composition
H2S Content Known (Hydrogen Sulfide levels documented), High BTU Content (1,000+ BTU, premium quality), Minimal Inerts (Low N2/CO2, good energy density), Wet Gas (Contains ethane, propane, butane - higher value), Dry Gas (Primarily methane, standard quality)

Learn How To Buy This Site

INTERESTED?
Would you like to learn more about this site? Schedule A Call Here https://bit.ly/BlueHawk15

Media

big site X5
big site X5
big site X5
big site X5

Location

Surface Rights
Surface Rights For Mining Secured, Surface Rights For Mining To Be Negoitiated, Surface Rights For Mining Unkown