Turnkey Price : $2,237,800
| Location |
Texas Onshore Gulf |
| Container Type |
Hydro – Foghashing S1200 |
| Generator Type |
Used CAT G3516 |
| Capacity |
73 PH/s |
| Effective Power Cost |
4.42¢/kWh |
| Cost to Mine 1 BTC |
$29,775 |
Site A2 HYD is a 1-megawatt hydro-cooled Bitcoin mining facility in the Texas Onshore Gulf region, tapping associated natural gas streams from active oil production — a fuel source that is abundant, consistently available, and increasingly in need of productive monetization. The Used CAT G3516 generator transforms this energy into steady, reliable power, underpinning a highly disciplined operational model built for long-term performance.
Mining hardware is housed in a Foghashing S1200 hydro-cooled container, an industry-leading immersion system that maximizes ASIC efficiency while protecting 204 units of the Bitmain S21+ Hydro from heat and environmental stress. Operating at 15 joules per terahash, this configuration achieves 73 petahash per second of sustained Bitcoin hashrate — all while maintaining hardware in conditions that extend operational life well beyond air-cooled alternatives.
Site A2 HYD achieves an effective power cost of 4.42 cents per kilowatt-hour and a Bitcoin production cost of $29,775 per coin, making it one of the most cost-efficient sites in the portfolio. The combination of associated gas availability, immersion-cooling discipline, and proven CAT generation infrastructure creates an operation purpose-built for resilient, low-cost Bitcoin production in one of North America’s most prolific onshore energy zones. Monthly output is approximately 1.08 BTC.