1st Edition

Renegade
Miner +

The Next Frontier of
Bitcoin Infrastructure

55%
Cost savings vs
US grid average
$19,635
Lowest BTC
production cost
24/7
Geothermal &
flare gas uptime
1st Edition

Editorial

Field intelligence for operators who don't wait for the mainstream to catch up. Real sites, real economics, real decisions.

01
Geothermal
The Next Frontier in Low‑Cost Power

No fuel. No combustion. The DOE's Enhanced Geothermal Systems program is targeting $45/MWh by 2035 — putting geothermal squarely in the conversation for Bitcoin miners hunting sub-$0.05 power.

MMA Editorial
02
Technology
DATUM Was Built for the Edge

A 1 EH/s operation on legacy Stratum uses roughly 200 GB of data per day. With DATUM, that drops to 8 GB — a 95% reduction. For remote flare gas sites on Starlink or LTE, this isn't a nice bonus. It's the whole ballgame.

MMA Editorial
03
Due Diligence
Flare Gas Bitcoin Mining: How Deals Get Done

Before any serious buyer deploys capital, two legal agreements need to be in place. The gas purchase agreement. The surface rights agreement. Both need to be fully executed before anything else matters. The difference between a great site and a costly mistake is in the data.

MMA Editorial
04
Equipment
Generators V. Turbines

Two technologies dominate the conversation for converting natural gas to Bitcoin. They are not equals. In most wild mining deployments, the choice is clear — and the economics prove it.

MMA Editorial
05
Field Report
The Deal That Wasn't — And Why That's a Win

What a 100 MCF site in Michigan taught us about due diligence, bad operators, and why Blue Hawk does this differently. A Bitcoin miner was saved from deploying $650,000 against a gas supply that didn't exist.

Jon Taylor
06
Strategy
Top 5 Things to Know About Wild Mining

Wild mining isn't a workaround — it's a strategy. The energy comes first. Bad paperwork kills good sites. Every well declines. Here's what separates operators who get it right from those who learn the hard way.

MMA Editorial
07
Equipment
Top 3 Things Every Miner Needs to Know About Generators

Your generator isn't support infrastructure — it IS your operation. Undersized generators are the most common and costly mistake in mining deployments. Remote monitoring isn't a luxury. Load management is a discipline, not an afterthought.

MMA Editorial
08
Flare Gas
Flare Hunters: In Search of Stranded Energy

Stranded energy doesn't advertise itself. The assets are buried beneath layers of land ownership, mineral rights, and regulatory complexity. The gap between a site that exists and a site that works is where most deals die.

Jon Taylor
Events — Renegade Miner
2026 — 2027

Events

Where the renegades are showing up. Conferences, summits, and forums across the Bitcoin mining and energy landscape — with exclusive discounts for the Renegade Miner community.

Find Us
in the Field

Jon Taylor and the Blue Hawk team attend key industry events throughout the year. Several events offer exclusive discount codes for the Renegade Miner community — use them at checkout. Booth opportunities are available at select events — contact Jon directly for rates.

4
Events this season
2
Exclusive coupon codes
2
Booth opportunities
July
21–23
2026
Miami Airport
Convention Center
Miami, Florida
Bitcoin Mining
Mining Disrupt

The world's largest Bitcoin mining expo and conference. Since 2019, Mining Disrupt has served as the central hub for education, collaboration, and commerce within the global Bitcoin mining industry. Thousands of power players, three access tiers, and the floor where deals get done.

Bitcoin Mining ASIC Hardware Energy & Power Networking
Get Tickets →
No coupon code available
July
23
2026
Dallas
Texas
Energy & Capital
Energy Investors Forum

Where capital meets energy and compute infrastructure. EIF brings together investors, operators, developers, miners, data center operators, utilities, and infrastructure providers to discuss where the next wave of value creation is emerging across power, AI infrastructure, and energy-intensive computing. Speakers include Congressman Earl Carter, the CEO of Canaan, Foundry, Upstream Data's Steve Barbour, and dozens more.

Energy & Capital Bitcoin Mining AI / HPC Investors Oil & Gas
Exclusive Discount
BLUE30
30% off tickets
Get Tickets → Inquire About Booth Rates →
September
23–24
2026
Columbus
Ohio
Bitcoin
Midwest Bitcoin Summit

The premier Bitcoin conference in the Midwest. Two days bringing together miners, operators, investors, and Bitcoin enthusiasts from across the region. Columbus, Ohio — September 23–24, 2026.

Bitcoin Midwest Mining Columbus, OH
Get Tickets →
No coupon code available
January
16
2027
Naples Beach Club
Four Seasons Resort
Naples, Florida
Bitcoin — 5th Annual
Bitcoin Day

A single day, high-signal, fast and focused Bitcoin-only event. Now in its 5th year, Bitcoin Day Naples takes place at the Naples Beach Club, A Four Seasons Resort. Dense content, legendary speakers, exclusive networking, and an intimate setting where you might have lunch with the keynote speaker. The most signal-per-hour of any Bitcoin event on the calendar.

Bitcoin Only High Signal Networking Naples, FL
Exclusive Discount
BLUEHAWK
21% off tickets
Get Tickets → Inquire About Special Booth Rates →
Energy Stack — Renegade Miner
Choosing the Right Energy Option

The
Alternative
Energy
Stack

Every watt costs something. The question is how much — and where it comes from. U.S. grid power averages $0.085/kWh. Solar improves on that but can't run through the night. Geothermal changes the conversation. Flare and stranded gas takes it further.

"Alternative mining isn't a niche strategy. At these numbers, it's the only strategy that makes sense."

Grid Power Industry baseline
U.S. commercial average
$0.085 per kWh
Solar Intermittent
Day-only generation
$0.055 per kWh
Geothermal No fuel · 98% uptime
No fuel · No combustion · 24/7 baseload
$0.048 per kWh
Flare & Stranded Gas Best-in-class
Gas operators are already paying to burn it off
$0.0360.044 per kWh
55%
Cost savings vs U.S. grid

Flare and stranded gas sites operate at a fraction of commercial grid cost — without utility bills, curtailment risk, or ISO dispatch orders.

$19,635
Lowest Bitcoin production cost

Site X5 in South Texas mines Bitcoin at $19,635 per coin — the lowest production cost in the Maverick Mining Alliance portfolio at $0.0383/kWh.

24/7
Baseload uptime

Geothermal and flare gas deliver power continuously — no weather penalty, no curtailment window, no grid exposure. The fuel is produced on-site and consumed on-site.

Ready to find your energy advantage?

Browse available flare gas and geothermal mining sites across Texas, Michigan, Utah, and beyond. Every site comes with gas contracts, surface rights, and managed operations.

Advertise — Renegade Miner
Partner With Us

Advertise

Connect with the people actually building Bitcoin infrastructure — the DIY'ers, the Mavericks, and the Renegades.

The Foundation of Bitcoin Mining

Before the public companies, the data centers, and the institutional capital, there were the renegades. Garage miners. Flare gas pioneers. Solo operators chasing geothermal, solar, and methane where nobody else looked. They built this industry — and they're still leading it.

Renegade Miner is the only publication written specifically for this operator class — the independent Bitcoin miner running 400 kW to 5 MW on stranded energy, making capital decisions, and hunting yield in hard markets.

Flare Gas Operators Independent Miners HNW Investors O&G Landowners ASIC Buyers Energy Developers Bitcoin Pleb Miners
1 MW
Average Site Size
Readers operate or are actively acquiring 400 kW–5 MW mining deployments
$650K+
Average Capital Deployment
Decision-makers with real capital ready to deploy into mining infrastructure
O&G
Oil & Gas Background
Operators, landmen, royalty owners, and field engineers crossing into Bitcoin mining
BTC26
Conference Attendees
Distributed at Bitcoin 2026 and major mining industry events nationwide
Now Accepting Advertisers — 2nd Edition
Solo
Mining
The independent miner's complete field guide
July 2026

Choose Your
Position

Print and digital placement available in the 2nd Edition. Limited positions — contact Jon Taylor to discuss availability and custom packages.

Print + Digital
Full Page
Full-page advertisement
  • Full-page print placement in Renegade Miner 2nd Edition
  • Digital version included — PDF and web
  • Your choice of interior position
  • Renegademiner.com digital banner (3 months)
  • Listed in the partner directory
Inquire About Pricing →
Editorial
Sponsored Content
Branded article or product spotlight
  • Full editorial-style sponsored article or product feature
  • Written by the Renegade Miner editorial team
  • Published in print and digital editions
  • Permanent placement on Renegademiner.com
  • Promoted across Renegade Miner social channels
Inquire About Pricing →

Ready to Reach the Renegades?

Advertising positions for the 2nd Edition are limited. The audience is small, focused, and deploying capital — not browsing. If your product or service belongs in the hands of serious mining operators, this is the right room.

JT
Jon Taylor
President & Founder · Blue Hawk Energy Solutions
[email protected]
Send a Quick Note

Tell us about your company and which placement you're interested in. Jon responds within one business day.